TEKAR TEKNİK ARAŞTIRMA TİCARET LTD. ŞTİ.
TEKAR TECHNICAL RESEARCH LIMITED COMPANY

Soil Mechanics, Fountation works, Construction, Consultancy


TAJIKISTAN

PROJECT : Shagon – Zigar Road Construction Project, Lot 1
CLIENT : Ministry of Transport of The Republic of Tajikistan Represented by Project Implementation Unit – Dushanbe Tajikistan
SCOPE OF WORKS : The Road lies 100 km east of Khulyab on the Khulyab-
Kalaykhum Highway. Scope of work includes; 5,5 kms (13+750 – 19+250) long, 9 m platform width, road construction
Survey works of 5.5 km.
Excavation 621 000 m3
Fill 210 000 m3
Drilling for Pre Splitting 75 000 m
Concrete for Reinforced Concrete works 15 000 m3
Adjustment Concrete 2 250 m3
Steel for Reinforced Concrete works 1 327 tons
Slope Protection works 1 700 m2
EXECUTED DURING : May 2003 – July 2005


PROJECT : Dangara Valley Irrigation Project, Phase 1
CLIENT : Ministry of Water Management and Amelioration
Represented by Project Implementation Unit, Tajikistan
SCOPE OF WORKS : The work consists of construction of irrigation canals and
prefabricated flumes, surface drainage, sub surface drainage with PVC pipe, irrigation system with buried pipeline, hydraulic structures like silt trap, siphon, bridge, pipe crossing, pipe below canal, aqueduct, outlet from canal to flume, outlet canal to pipeline, tail escape etc. the works also include treatment from soil subsidence, land leveling and electric line.
Irrigation area 2 500 ha
Excavation 2 992 000 m3
Embankment 493 000 m3
Precast reinforced concrete erection 4 320 m3
Bulk Reinforced Concrete erection 10 920 m
Bulk Concrete erection works 16 611 m3
Metal works 340 tons
Pipeline works 159,73 km
Clearing and grubbing 2 500 ma
Power Transmission Line 7 km
EXECUTED DURING : October 2002 – October 2005
PROJECT : New U.S. Embassy Project, Dushanbe - Tajikistan
CLIENT : Kullman Industries, Inc.
SCOPE OF WORKS : Soil Settling, Perimeter Wall, Building foundatiıns and concrete works.
EXECUTED DURING : June 2003 – March 2005

PROJECT : Lot 4, Rehabilitation and Stabilization of 500/220 kV
Switchyard Foundation in Nurek Hpp
CLIENT : Open Stock Holding Power Company “Barki Tojik”
SCOPE OF WORKS : Rehabilitation of access roads
Mapping
Project development
Excavation
Construction of Drainage Channels
Filling of Holes
Concrete Drainage Channel
EXECUTED DURING : October 2003 – June 2005

Return to Projects
 
main page
  about tekar
  projects
  staff
  machine park
  affiliates
türkçe
J.F. Kennedy Cad. No:148/1-2-3 06700 Gaziosmanpaşa / Ankara Turkey Tel : + 90 312 467 82 43 Fax : +90 312 467 39 78

Zebuniso Street, No: 45/1 Dushanbe
Tel: + 992.372 25 59 01 FAX: + 992.372 25 59 04