TEKAR IN AFRICA
UGANDA
SIERRA LEONE
COMOROS ISLANDS
WATERLOO – MASIAKA ROAD REPUBLIC OF SIERRA LEONE
PROJECT : Economical and Technical Feasibility Study of WATERLOO – MASIAKA Road
CLIENT : REPUBLIC OF SIERRA LEONE, MINISTRY OF WORKS AND LABOR
SCOPE OF WORK : Economic Analysis, Traffic and Topographical Survey, Hydrological, Geological and Geotechnical Investigations, Preparation of Engineering Drawings (46 kilometers)
EXECUTED DURING : 1985 – 1986
IN ASSOCIATION WITH : SWK, Scott Wilson and Kirkpatrick, Basingstoke – UK and GENAC Ltd., Freetown – Sierra Leone
FINANCED BY : ISLAMIC DEVELOPMENT BANK.
WATERLOO – MASIAKA ROAD REPUBLIC OF SIERRA LEONE
PROJECT : WATERLOO – MASIAKA Road Detailed Engineering Design and Preperation of Contract Documents
CLIENT : REPUBLIC OF SIERRA LEONE, MINISTRY OF WORKS
SCOPE OF WORK : Planning and final design with all Topographical Survey, Hydrological, Geological and Geotechnical Investigations, Preparation of Contract Documents (46 kilometers)
EXECUTED DURING : 1988 – 1989
IN ASSOCIATION WITH : SWK, Scott Wilson and Kirkpatrick, Basingstoke – UK and GENAC Ltd., Freetown – Sierra Leone
FINANCED BY : ISLAMIC DEVELOPMENT BANK, Jeddah – Saudi Arabia
KENEMA – ZIMMI ROAD REPUBLIC OF SIERRA LEONE
PROJECT : Economical and Technical Feasibility Study of KENEMA – ZIMMI Road
CLIENT : REPUBLIC OF SIERRA LEONE, MINISTRY OF WORKS AND LABOR
SCOPE OF WORK : Economic Analysis, Traffic and Topographical Survey, Hydrological, Geological and Geotechnical Investigations, Preparation of Engineering Drawings (84 kilometers, including MaoRiverBridge)
EXECUTED DURING : 1987 – 1989
IN ASSOCIATION WITH : SWK, Scott Wilson and Kirkpatrick, Basingstoke – UK and ENGCON Ltd., Freetown – Sierra Leone
FINANCED BY : ISLAMIC DEVELOPMENT BANK, Jeddah – Saudi Arabia
THIRD CEMENT PLANT REPUBLIC OF UGANDA
PROJECT : THIRD CEMENT PLANT Economical and Technical Feasibility Study
CLIENT : REPUBLIC OF UGANDA, UGANDA DEVELOPMENT BANK
SCOPE OF WORK : Economic Analysis, Raw Material Investigation, Topographic Survey, Geological Mapping and Core drilling including all laboratory testing
EXECUTED DURING : 1981 – 1982
IN ASSOCIATION WITH : CIMHOL, Turkish Cement Industries Corp., Ankara– Turkey
FINANCED BY : ISLAMIC DEVELOPMENT BANK, Jeddah – Saudi Arabia
ANJUAN ISLAND – MITSUMUDU PORT CURUDE OIL LOADING/UNLOADINGTERMINAL and TANKFARMREPUBLIC OF COMOROSISLANDS
PROJECT : AnjuanIsland – MitsumuduPort, Crude Oil Loading Unloading Terminal and Tank Farm Detailed Engineering Design and Preparation of Contract Documents
CLIENT : REP. OF COMOROS ISLANDS, UGANDA DEVELOPMENT BANK
SCOPE OF WORK : Planning and final design with all Topographic Hydraulic and Geotechnical İnvestigations, including all necessary Laboratory Testing, Mechanical and Structural services, Preparation of Tender Documents
EXECUTED DURING : 1983 – 1985
IN ASSOCIATION WITH : CICO Engineering Ltd., Canada and ESER Müh. Ltd., Ankara– Turkey
FINANCED BY : ISLAMIC DEVELOPMENT BANK,