TEKAR IN REPUBLIC OF TAJIKISTAN

KULYAB – KLAIGHKUM ROAD SHOURABAD – SHAGON SECTION (SECTION B & C)

PROJECT : Construction of Kulyab – Kalaighkum Road, Shorurabad – Shagon Section (Section B & C)
CLIENT : Republic of Tajikistan, Ministry of Transport
SCOPE OF WORK : Construction 40.7 km road at rough topography starting over 2200 m and completion at 1400 m elevation, including construction of 9 Bridges (with total length over 1 km), slope and flood protection works, drainage structures, Street Lighting, asphalt pavement and other related works.
Earth Work (exc) 4,796.820 M3
Earth Work (backfill) 613,643 M3
Concrete works 149,329.34 M3
Asphalt Works 95,420.12 M3
Base Course 485,758 M3
EXECUTED DURING : 29.12.2011 – 09.09.2017
MAIN CONTRACTOR : COMBINED GROUP – TEKAR J.V.
FINANCED BY : ISLAMIC COORDINATION GROUP (Islamic Development Bank, Kuwait Fund, Saudi Fund, Abu Dhabi Fund and OPEC Fund)
CONTRACT VALUE : 92,021,914.59- USD

KULYAB – KLAIGHKUM ROAD SHOURABAD – SHAGON SECTION (SECTION B & C)

KULYAB – KLAIGHKUM ROAD SHOURABAD – SHAGON SECTION (SECTION B & C)

KULYAB – KLAIGHKUM ROAD SHOURABAD – SHAGON SECTION (SECTION B & C)

KULYAB – KLAIGHKUM ROAD SHOURABAD – SHAGON SECTION (SECTION B & C)

SHAGON – ZIGAR ROAD, LOT-1

PROJECT : Construction of Shagon – Zigar Road, Lot -1
CLIENT : Republic of Tajikistan, Ministry of Transport
SCOPE OF WORK : Construction of 5,8 km of single carriageway road with 9 m platform width at very rough topography, including construction of 1 viaduct and 4 half bridges, slope protection works, drainage structures, and other related works.

Excavation of rock with blasting 780000M3
Formation of access road 10000M3
Excavation of Suitable material 64000M3
Structural excavation of rock 13000M3
Deposition of rock fill 180000M3
Cast in place reinforced concrete 9660M3
Pre-splitting holes (50 mm to 125 mm) 75000M
Rock bolts and dowels 1520M
Shotcrete 7360M3

EXECUTED DURING : 11.04.2003 – 22.06.2006
MAIN CONTRACTOR : COMBINED GROUP – AGE – TEKAR J.V.
FINANCED BY : ISLAMIC DEVELOPMENT BANK
CONTRACT VALUE : 9,388,058.51- USD

SHAGON – ZIGAR ROAD, LOT-1 REPUBLIC OF TAJIKISTAN

DANGARA VALLEY IRRIGATION PROJECT, PHASE-1

PROJECT : Dangara Valley Irrigation Project, Lot -1
CLIENT : Republic of Tajikistan, Ministry of Meloeration SCOPE OF WORK : Irrigation area is 2500 hectares. Construction of irrigation channels (lined and earth), prefabricated flumes, surface drainage, sub-surface drainage, irrigation network with PE pipes and hydraulic structures (silt traps, syphones, bridges, pipe crossings, outlets etc). Project also includes treatment of soil subsidence, leand levelling and electric lines.

Excavation 5000000M3
Filling 500000M3
Cast in place reinforced concrete 21000M3
Pre-cast concrete elements k 2000M3
Underground drainage pipes 13000M
Covered irrigation system PE pipes 75000M
Steel pipe works 6500M
Irrigation hose pipes 62500M
Energy transmission Line 7000M

EXECUTED DURING : 22.10.2002 – 21.10.2005
MAIN CONTRACTOR : AGE – TEKAR J.V.
FINANCED BY : ISLAMIC DEVELOPMENT BANK
CONTRACT VALUE : 6,549,056.80- USD

NUREK HPP (Loan 1817 – TAJ) EXCAVATION OF TAILRACE CHANNEL OF NUREK HPP LOT-3

PROJECT : Excavation of Tailrace Channel of Nurek HPP, Lot-3
CLIENT : Barki Tajik – Republic of Tajikistan
SCOPE OF WORK : Construction of 2 reinforced concrete dams at Safetob river (Km 0+095 and 0+790), construction of channel at Safetob River (700 m in length), excavation of river bed material at Vakhsh River (668,556.97 m3)
EXECUTED DURING : 16.08.2005 – 19.09.2008
MAIN CONTRACTOR : TEKAR Ltd.
FINANCED BY : ASIAN DEVELOPMENT BANK
CONTRACT VALUE : 4,396,441.34 USD

NUREK HPP (Loan 1817 – TAJ) EXCAVATION OF TAILRACE CHANNEL OF NUREK HPP LOT-3